

LETITIA
After some ongoing engine problems Letitia made the journey to Navigators by road to undergo some much needed work. In preparation for the 85th Commemorative Return to Dunkirk the most important job was replacing her engine for something reliable and appropriate for her size. Refurbishing the power, steering and electrical systems also gave her owners back the vessel they love, and could now trust on journeys.












Relocating the generator on a custom frame for ease of access.
Early morning arrival for Letitia into Chichester Boatyard behind the Navigators workshop.
Checking below the waterline after some time on a mud based mooring.
New engine day for Letitia, with a brand new Vetus M4.56.
Navigators team with the new engine in place.
Plumbing in the new Vetus engine.
New fuel management system for twin fuel tanks.
The finished installation, with easy access to service both the engine and generator.
Removing the rudder to change the prop.
Brand new propellor, matched perfectly to her size and power.
Final antifoul touch ups before launch.
Some traditional repairs to below the waterline.



Ready to move to her new mooring.
Letitia launching at Chichester Marina.
Making her way across the yard for the launch.